Answers

  • 0
  • 0

Construction Precautions for Foam Lightweight Soil

If you are looking for high-quality products, please feel free to contact us and send an inquiry, email: brad@ihpa.net



Analysts at JPMorgan recommended selling or "underweight" emerging market local currency sovereign debt because of the global impact of the Ukraine-Russia crisis.

JPMorgan estimated that fixed-income assets in emerging markets have lost 6-9 percent of their value since Russia invaded Ukraine a month ago, with nervousness about the war and its impact on global energy and food prices adding to existing pressures.

Some leading emerging market central banks are signaling that interest rates now need to rise faster than previously expected, which fuels fears of "stagflation". Stagflation means when high inflation and higher interest rates undermine economic growth.  

With both the U.S. Federal Reserve and emerging market central banks raising interest rates, JPMorgan also said it made sense to "underweight" emerging market assets by taking advantage of the recent pullback in local currency bond yields relative to TREASURIES.  

JPMorgan said major metals exporters such as South Africa, Chile, and Peru could still do well, but warned that emerging market fixed income assets now faced a more "stagflationary" trajectory.

The markets and prices of many commodities, metals, chemicals like the Foam Lightweight still face uncertainty.


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


New Delhi: India's Oil Ministry recently conveyed its intention to five national oil companies including Indian Oil Corp and Bharat Petroleum Resources LTD to assess the possibility of buying shares in Russian oil projects sold by European and American oil majors.  

Bp announced it would give up its 19.75% stake in Rosneft, the Russian oil company.  ExxonMobil said on March 1 that it would exit about $4 billion in assets and terminate all of its Russian operations, including the Sakhalin-1 project in Russia's far East.  

India's oil ministry has asked the overseas investment arm of India's Oil and Gas Corporation to consider buying ExxonMobil's 30 percent stake in the Sakhalin 1 project in Russia's far East. ExxonMobil is the operator of the project and Indian companies already have a 20 percent stake in the project.

Because of the ever-changing international situation, the supply and prices of international bulk Foam Lightweight are still very uncertain.

Inquiry us

The preparation method of lithium sulfide

Basic information of molybdenum disulfide

Is Molybdenum Disilicide a Dangerous Good?

Hafnium Diboride HfB2 Powder Applications

Overview of vanadium nitride VN powder

Overview and wide application of molybdenum disulfide

Properties of cuprous oxide Cu2O powder

Wide application of lithium 12-hydroxystearate

Application of Chromium Diboride CrB2 Powder

What are copper and cuprous oxide?

Overview of Sodium Myristate

How is aluminum nitride AlN powder produced?

Is boron carbide harmful to the human body?

The four most commonly used solid lubricants are

How to determine the optimum dosage of concrete superplasticizer

Cuprous oxide is often used as a catalyst for the production of other chemicals

Application of boron carbide B4C powder

The impact of a new round of class 6 power cuts in South Africa on of bulkhead cable gland supplier

The main characteristics of nano diamond powder

How to use boron powder on plants?

Our Latest Answers

What is a polycarboxylate superplasticizer

In 2023, the China Greater Bay Area Concrete Industry High-Quality Development Seminar and the Expo on Concrete Equipment and Technology will take place at the Guangzhou Canton Fair Complex. Guangzhou Canton Fair Complex. The conference's theme will…

Why does properly poured concrete end up cracking

It is very easy to cause concrete cracking if the construction or maintenance are not done correctly. What are then the five main causes of cracking concrete? 1. The cement problem: Some workers in construction will privately add more water for a mor…

What is Molybdenum disulfide MoS2 powder

Description of Molybdenum diulfide Molybdenum disulfide (also known as MoS2) is a transition metal sulfide. It is dark grey, or black, solid. It has a layering crystal structure consisting of alternately arranged sulfur and molybdenum molecules. Mo…